Home > Installation Instruction For BathSelect®Solid Brass Multi Color LED Rainfall Shower Head With Handheld Shower And Thermostatic Mixer In Gold Finish
Installation Instructions


Head Shower Installation

· Decorative cover
· Screws
· Pipe 1
· Pipe 2
· Screw
· Bolt
· Nut
· Water Inlet Pipe


hole size on ceiling

1. Drawing the line on the ceiling according to the above specification
· Decorative Cover
· pipe 1

2. connect pipe 1 with decorative cover


3. Drill the holes on the ceiling according to the above hole specification and install 4 pipes.
4. According to the right drawing, install four-pipe 2 into pipe 1. Put the screw bolts through the hole on the side to lock pipe 2 with pipe 1.

5. As the right drawing is shown, install four-pipe 2 on the head shower.

6. After fixing the showerhead on the ceiling, connect the shower hose with 2 water inlet on the showerhead back cover. The other end connects with the water outlet pipe in the wall.





Remarks: Ceiling mounted shower head come with fixing bar installation

1. Draw size on ceiling

2. Install fixing bar on ceiling

3. Install fixing bar on shower head


4. Put shower head bar on ceiling fixing bar.

The showerhead installation is now complete.

Body-Jet Installation


Water Supply
Nipple Mamelon Nipple

· Pressure Balancing Loop
1. Route the water supply lines.

2. If installing more than one bodyspray off the same supply line, construct a pressure balancing loop. Locate a tee along the loop at each bodyspray installation location.

3. Do not strap the pipes at this time.

Single Bodyspray Installation

· Nipple Mamelon Nipple

1. Route the water supply line.

2. Install an elbow to the end of the supply pipe at the bodyspray installation location.


Install the Plaster Guard

· Elbow (or Tee)

· Install the plaster guard

Set Piping Depth

Align mark with the front of the stud face

· Thin Wall

Align mark with the front of the stud face

· Standard Wall

Install the plaster guard. Push until the plaster guard is snug against the face of the elbow (or tee).


1. Install the water-resistant wallboard.

2. Cut out a 4" (10.2 cm) to 4-1/4" (10.8 cm) square at each of the installation location.

3. Install the finished wall material


1. Insert the escutcheon into the rough opening. The double ribs of the leak shield should be facing up.

2. If the leak shield makes contact with the elbow: Enlarge the hole in the back of the leak shield to 1-1/4" (3.2 cm).

3. Thread the adapter onto the nipple using the provided 11 mm bit, 11 mm or 7/16" socket, extension and socket wrench. Use masking tape to hold the bit in place, as the bit could fall off and cause damage.

IMPORTANT! The escutcheon should sit loosely at this point. If it is tight against the wall, use a longer pipe nipple.

4. Align the groove in the waterway with the double ribs on the leak shield.

5. Press the waterway into place over the adapter. Secure the waterway to the adapter with the screw provided.

6. Verify that the escutcheon does not turn or shift.
· Escutcheon
· Leak Shield
· Adapter
· Extension
· Socket Wrench With Bit
· Screw
· Waterway Passage


With the ribs of the spray head facing up, install the spray head to the waterway.



Skip to content